Tuesday, November 24, 2015

Change T/RH to single ended

Changed T/RH to single ended after finding the data was holding constant values.  JF

Thursday, November 19, 2015

Site Check and Filter Change

20151119  site check and filter change, low intensity B alarm 37846 Hz   min set = 45000 Hz. All OK - dwa

Tuesday, November 3, 2015

Site Check


20151103  site check, Computer had crashed, performed manual reboot, low intensity B alarm 37964 Hz   min set = 45000 Hz. All OK - dwa

Tuesday, October 27, 2015

Site Check

20151027  site check, low intensity B alarm 38057 Hz   min set = 45000 Hz. All OK - dwa

Monday, October 19, 2015

Site Check


20151019  site check, low intensity B alarm 38155 Hz   min set = 45000 Hz. All OK - dwa

Tuesday, October 13, 2015

Site Check and Filter Change


20151013  site check and filter change, low intensity B alarm 38056 Hz   min set = 45000 Hz. All OK - dwa

Thursday, October 8, 2015

Site Check


20151008  site check, low intensity B alarm 38204 Hz   min set = 45000 Hz. All OK - dwa

Monday, September 28, 2015

Site Check

20150928  site check, low intensity B alarm 38200 Hz   min set = 45000 Hz. All OK - dwa

Monday, September 21, 2015

Site Check

20150921  site check, low intensity B alarm 38218 Hz. All OK - dwa

Monday, September 14, 2015

Site Check and Filter Change

20150914  site check and filter change, low intensity B alarm 38330 HZ. All OK - dwa

Tuesday, August 4, 2015

20150803 Site Restart

Electricity, air conditioning, and internet is back on after construction renovations. Restarted the site.

All OK

Monday, July 27, 2015

Site check Ongoing Construction

Construction is not yet complete and building is still too hot to restart the site chem instrument.

Monday, July 13, 2015

Site is still Down due to Construction

Downloaded data with extension cord to room. Room to small to run instrument with air conditioner off during construction.

Monday, July 6, 2015

Site Check Electricity is Off

Power is off until until July 20th at the latest due to Major construction renovations to the school.

Tuesday, June 23, 2015

Site Check

All OK

Heavy construction and roofing hot tar pot near inlet.

Wednesday, May 27, 2015

Site Check


Ozone 49C
Low Intensity B alarm

Cell A = 69887 Hz
Cell B = 38936 Hz

Monday, April 13, 2015

Site Check

All ok

Cleaned tubes on A and B cells, Intensity B is still low

Tuesday, January 20, 2015

Monday, January 12, 2015